
Fit Out Company in Dubai
Bait Al Ebdaa is a fit-out contractor for villas, apartments and commercial units in Dubai. One contract covers civil works, MEP, finishes and joinery, and the joinery is made in our own factory in Ajman. Which Dubai authority your building answers to decides the permit your works need, so that is the first thing we check.
- Standard villa fit-out: AED 300–450 per sq ft
- DDA and Dubai Municipality submissions on a government HQ in Dubai Academic City
- Joinery made in our 15,000 sq ft Ajman factory
- Free site survey and a 5-year joinery workmanship guarantee
What a turnkey fit-out in Dubai covers
A turnkey fit-out takes a space from its current state, whether that is a developer handover unit, a stripped villa or a tired office, to a finished interior under a single contract. With us, that contract runs from design sign-off to handover:
- Design approved in photorealistic 3D before any site work starts
- Civil works: partitions, ceilings, flooring and wall finishes
- MEP: electrical, plumbing and air-conditioning changes
- Joinery, from kitchens and wardrobes to wall panelling, manufactured in our Ajman factory
- Authority submissions and NOC coordination for your building and scope
- Snagging and final handover
Fitting out a workplace rather than a home? Our office fit-out service covers workspace planning, acoustics and phasing around a working team.
Which Dubai authority approves your fit-out
Dubai has no single fit-out permit. The route depends on who regulates the building, and getting it right at the start saves redrawing later. The summary below is taken from each authority's own website; the authority's current rules always apply.
Mainland Dubai: Dubai Municipality
Decoration works are licensed under Administrative Resolution No. (85) of 2019. Dubai Municipality's service catalogue lists a permit for decorative works in units over 100 sqm, and a self-permit route through which building contracting and décor companies can obtain an instant permit for decorative works in units over 100 sqm, subject to conditions. Modifications or additions to a building need their own permit, and the municipality issues a completion certificate for permits that include décor, modifications and maintenance.
DDA communities: the fit-out permit
In areas regulated by Dubai Development Authority, the contractor applies for a fit-out permit. DDA lists the documents as a contractor appointment letter from the tenant, the EJARI, an NOC from the building owner, NOCs from the relevant authorities and stamped drawings.
- Fee: AED 0.90 per sq ft, minimum AED 200 and maximum AED 10,000, plus AED 10 Knowledge Dirham and AED 10 Innovation Dirham per transaction
- Estimated processing time: two working days; the permit is valid for six months
- A Dubai Civil Defense completion certificate is needed before DDA issues the fit-out completion certificate
- Structural additions, a change of use or extra floor area need a separate building modification request
Before any permit: the building's own approval
Most towers and master communities also ask for their own approval before works start, usually through building management or the developer's community team, and their rules on deposits and working hours differ from building to building. Ask for your building's fit-out guidelines early. Our published approval support starts at AED 2,500 for landlord or community NOC coordination and AED 4,500 for Dubai Municipality approval support; authority, developer and consultant fees are charged separately at actual cost.
What a fit-out in Dubai costs
Our published villa fit-out bands are AED 300–450 per sq ft for a standard finish, AED 500–750 per sq ft for a luxury specification and AED 800–1,200+ per sq ft for fully bespoke interiors. Office fit-out starts at AED 220–350 per sq ft for an essential specification. All figures exclude VAT, and your own quotation follows a site survey.
Where a project lands within a band, or above it, comes down to four things:
- Starting condition. A developer shell needs far more civil and MEP work than an occupied villa being refreshed.
- Services that move. Relocating a kitchen or bathroom, or adding air-conditioning zones, adds MEP work and often an approval.
- Joinery content. Kitchens, wardrobes and panelling are often the largest single line in a Dubai villa budget.
- Building requirements. Permit fees, community deposits and NOC charges are passed on at actual cost.
Renovating a villa you already live in? The villa renovation cost guide breaks that budget down further.
How long a Dubai fit-out takes
For a full turnkey villa, our published timeline is three to six months from the first consultation to handover. That includes concept design, 3D sign-off and authority approvals; once the design is approved, the work on site typically runs 6–10 weeks.
Authority review sits inside that programme. DDA gives an estimated two working days for its fit-out permit, but building NOCs, any resubmission and the civil defence completion step add their own time, which is why we confirm the programme in writing after the survey rather than before it.
Examples of our work
Completed work and design visuals by our team, shown for style and finish. Not all of them are in Dubai; ask us for examples near you.



A controlled journey
Process and project scope
Discover
Site review, brief, priorities and investment alignment.
Visualize
Plans, materials and photorealistic 3D CAD renders.
Approve
Technical packages, Dubai Municipality and NOC coordination.
Make
Joinery production, fit-out, installation and considered handover.
Estimate your budget
1Property size
3,500 sq ft
2What do you need?
ESTIMATED INVESTMENT
Calculated Contract Value
AED770,000
Indicative estimate in AED, excluding VAT. Your exact quote follows the free site visit.
Included
- 3D Architectural CAD Package
- Municipality NOC coordination
- 15k sqft Ajman Joinery Production
- 5-Year Workmanship Guarantee
Indicative pricing
Fit-Out starting prices
Published starting prices in AED, excluding VAT. Your own quotation follows a site visit.
See full pricing- Standard villa fit-outAED 300–450 / sq ft
- Luxury villa fit-outAED 500–750 / sq ft
- Essential office fit-outAED 220–350 / sq ft
- Premium office fit-outAED 400–650 / sq ft
Bait Al Ebdaa
Why choose Bait Al Ebdaa
In-house manufacturing — every joinery piece is produced in our own 15,000 sq ft Ajman factory, not outsourced.
One accountable team — design, approvals, build and joinery run under a single contract, not multiple subcontractors.
Approvals coordinated in-house — our team coordinates applicable authority submissions and NOC requirements based on the project location and scope.
5-year workmanship guarantee on joinery we manufacture and install.
Real project experience, including a 50,500 sq ft government authority headquarters delivered in Dubai Academic City.
Dubai fit-outs we have delivered
Confidential Government Authority Headquarters, Dubai Academic CityInterior fit-out and MEP works across three floors in Dubai Academic City, including the DDA and Dubai Municipality submissions.
Downtown Dubai Tech HQ OfficeAn office fit-out for a technology company: MEP coordination, Dubai Municipality approvals and custom joinery panelling.
Dubai Hills Estate Luxury VillaA full turnkey villa fit-out with European walnut wardrobes, media wall and dressing units made at our Ajman factory.Got questions?
Fit-Out in Dubai: FAQs
Everything you need to know about planning and delivering your interior project with Bait Al Ebdaa.
Something else?
Our AI assistant answers questions about our services at any hour.
It depends on the scope and the building. Dubai Municipality licenses decoration works under Administrative Resolution No. (85) of 2019 and lists permits for decorative works in units over 100 sqm, and many towers and communities need their own approval even for cosmetic work. We confirm what your scope needs at the site survey, before anything is priced.
Official sources, checked 16 October 2026
- Dubai Municipality: services catalogue
- Dubai Municipality: Buildings Regulation and Permits Agency
- Dubai Development Authority: Fit-Out Permit
This page summarises what each authority publishes on its own website as of the date above. Requirements and fees can change; the authority's current rules always apply.
Start your Fit-Out project in Dubai today
WhatsApp NowFit-Out in other areas
Other services in Dubai
Further reading









