Fit Out Company in Dubai
Dubai

Fit Out Company in Dubai

Bait Al Ebdaa is a fit-out contractor for villas, apartments and commercial units in Dubai. One contract covers civil works, MEP, finishes and joinery, and the joinery is made in our own factory in Ajman. Which Dubai authority your building answers to decides the permit your works need, so that is the first thing we check.

WhatsApp Now Call Now
Indicative pricingAED 300–450 / sq ftStandard villa fit-out
  • Standard villa fit-out: AED 300–450 per sq ft
  • DDA and Dubai Municipality submissions on a government HQ in Dubai Academic City
  • Joinery made in our 15,000 sq ft Ajman factory
  • Free site survey and a 5-year joinery workmanship guarantee
15,000sq ft manufacturing facility
1:1design-to-production control
UAEDelivery in all seven emirates
5-yearworkmanship guarantee on our joinery

What a turnkey fit-out in Dubai covers

A turnkey fit-out takes a space from its current state, whether that is a developer handover unit, a stripped villa or a tired office, to a finished interior under a single contract. With us, that contract runs from design sign-off to handover:

  • Design approved in photorealistic 3D before any site work starts
  • Civil works: partitions, ceilings, flooring and wall finishes
  • MEP: electrical, plumbing and air-conditioning changes
  • Joinery, from kitchens and wardrobes to wall panelling, manufactured in our Ajman factory
  • Authority submissions and NOC coordination for your building and scope
  • Snagging and final handover

Fitting out a workplace rather than a home? Our office fit-out service covers workspace planning, acoustics and phasing around a working team.

Which Dubai authority approves your fit-out

Dubai has no single fit-out permit. The route depends on who regulates the building, and getting it right at the start saves redrawing later. The summary below is taken from each authority's own website; the authority's current rules always apply.

Mainland Dubai: Dubai Municipality

Decoration works are licensed under Administrative Resolution No. (85) of 2019. Dubai Municipality's service catalogue lists a permit for decorative works in units over 100 sqm, and a self-permit route through which building contracting and décor companies can obtain an instant permit for decorative works in units over 100 sqm, subject to conditions. Modifications or additions to a building need their own permit, and the municipality issues a completion certificate for permits that include décor, modifications and maintenance.

DDA communities: the fit-out permit

In areas regulated by Dubai Development Authority, the contractor applies for a fit-out permit. DDA lists the documents as a contractor appointment letter from the tenant, the EJARI, an NOC from the building owner, NOCs from the relevant authorities and stamped drawings.

  • Fee: AED 0.90 per sq ft, minimum AED 200 and maximum AED 10,000, plus AED 10 Knowledge Dirham and AED 10 Innovation Dirham per transaction
  • Estimated processing time: two working days; the permit is valid for six months
  • A Dubai Civil Defense completion certificate is needed before DDA issues the fit-out completion certificate
  • Structural additions, a change of use or extra floor area need a separate building modification request

Before any permit: the building's own approval

Most towers and master communities also ask for their own approval before works start, usually through building management or the developer's community team, and their rules on deposits and working hours differ from building to building. Ask for your building's fit-out guidelines early. Our published approval support starts at AED 2,500 for landlord or community NOC coordination and AED 4,500 for Dubai Municipality approval support; authority, developer and consultant fees are charged separately at actual cost.

What a fit-out in Dubai costs

Our published villa fit-out bands are AED 300–450 per sq ft for a standard finish, AED 500–750 per sq ft for a luxury specification and AED 800–1,200+ per sq ft for fully bespoke interiors. Office fit-out starts at AED 220–350 per sq ft for an essential specification. All figures exclude VAT, and your own quotation follows a site survey.

Where a project lands within a band, or above it, comes down to four things:

  • Starting condition. A developer shell needs far more civil and MEP work than an occupied villa being refreshed.
  • Services that move. Relocating a kitchen or bathroom, or adding air-conditioning zones, adds MEP work and often an approval.
  • Joinery content. Kitchens, wardrobes and panelling are often the largest single line in a Dubai villa budget.
  • Building requirements. Permit fees, community deposits and NOC charges are passed on at actual cost.

Renovating a villa you already live in? The villa renovation cost guide breaks that budget down further.

How long a Dubai fit-out takes

For a full turnkey villa, our published timeline is three to six months from the first consultation to handover. That includes concept design, 3D sign-off and authority approvals; once the design is approved, the work on site typically runs 6–10 weeks.

Authority review sits inside that programme. DDA gives an estimated two working days for its fit-out permit, but building NOCs, any resubmission and the civil defence completion step add their own time, which is why we confirm the programme in writing after the survey rather than before it.

A controlled journey

Process and project scope

  1. Discover

    Site review, brief, priorities and investment alignment.

    At your site

  2. Visualize

    Plans, materials and photorealistic 3D CAD renders.

    In our studio

  3. Approve

    Technical packages, Dubai Municipality and NOC coordination.

    With the authorities

  4. Make

    Joinery production, fit-out, installation and considered handover.

    At our Ajman factory

1Property size

3,500 sq ft

50015,000 sq ft

2What do you need?

ESTIMATED INVESTMENT

Calculated Contract Value

AED770,000

Indicative estimate in AED, excluding VAT. Your exact quote follows the free site visit.

Included

  • 3D Architectural CAD Package
  • Municipality NOC coordination
  • 15k sqft Ajman Joinery Production
  • 5-Year Workmanship Guarantee

Indicative pricing

Fit-Out starting prices

Published starting prices in AED, excluding VAT. Your own quotation follows a site visit.

See full pricing
  • Standard villa fit-outAED 300–450 / sq ft
  • Luxury villa fit-outAED 500–750 / sq ft
  • Essential office fit-outAED 220–350 / sq ft
  • Premium office fit-outAED 400–650 / sq ft

Bait Al Ebdaa

Why choose Bait Al Ebdaa

01

In-house manufacturing — every joinery piece is produced in our own 15,000 sq ft Ajman factory, not outsourced.

02

One accountable team — design, approvals, build and joinery run under a single contract, not multiple subcontractors.

03

Approvals coordinated in-house — our team coordinates applicable authority submissions and NOC requirements based on the project location and scope.

04

5-year workmanship guarantee on joinery we manufacture and install.

05

Real project experience, including a 50,500 sq ft government authority headquarters delivered in Dubai Academic City.

Dubai fit-outs we have delivered

Got questions?

Fit-Out in Dubai: FAQs

Everything you need to know about planning and delivering your interior project with Bait Al Ebdaa.

Something else?

Our AI assistant answers questions about our services at any hour.

It depends on the scope and the building. Dubai Municipality licenses decoration works under Administrative Resolution No. (85) of 2019 and lists permits for decorative works in units over 100 sqm, and many towers and communities need their own approval even for cosmetic work. We confirm what your scope needs at the site survey, before anything is priced.

Official sources, checked 16 October 2026

This page summarises what each authority publishes on its own website as of the date above. Requirements and fees can change; the authority's current rules always apply.

Start your Fit-Out project in Dubai today

WhatsApp Now

Further reading