Choosing a fit-out company in Dubai decides how your home or office will look, work and hold up for years. The right company is not always the cheapest or the one with the best photos. It is the one that can show you, in writing, exactly what it will build, who will build it, how approvals will be handled and what happens if something goes wrong after handover. These are the questions we suggest every client asks, including when they are talking to us.

The Short Answer: 12 Questions to Ask Before You Sign

  1. Is it one contract, or several trades?
  2. What exactly is in the quotation, and what is excluded?
  3. Is design included, and do I approve it before site work starts?
  4. Who handles authority approvals and NOCs, and who pays the fees?
  5. Who makes the joinery: your own factory or a supplier?
  6. Who will be on site: your team or subcontractors?
  7. Can I see finished projects and visit your workshop?
  8. How is the programme set, and when is it confirmed in writing?
  9. How are payments structured?
  10. What happens if the scope changes?
  11. What guarantee do you give, and on what exactly?
  12. Who do I call after handover?

Scope and Contract

1. One contract, or several trades?

Some fit-out companies deliver the work themselves. Others act as a broker, passing civil works, MEP, joinery and finishes to separate contractors. With the second model, it is hard to know who is responsible when something is late or wrong. Ask plainly: who is accountable to me for each part of the work? At Bait Al Ebdaa, design, approvals, build and joinery run under one turnkey fit-out contract with one accountable team.

2. What exactly is in the quotation?

A single total is not enough to compare. Ask for an itemised quotation, line by line, and ask what is excluded: 5% VAT, authority fees and any third-party charges. A good quotation names the finish level, materials and joinery for each room, not just a price per square foot. You can see where the numbers start on our published price list.

3. Do I approve the design before work starts?

Most fit-out disputes begin when what the client imagined differs from what was built. Ask whether the design will be shown in photorealistic 3D renders that you approve before any site work. That is how we work: concept, materials and lighting are signed off on screen first, and what you approve is what gets installed.

Approvals

4. Who handles approvals and NOCs?

Many fit-out works need a no-objection certificate (NOC) from the building management or master developer, and some need an authority approval depending on the area and the type of work, especially layout changes and MEP works. Ask who prepares the drawings, submits the applications and follows them up, and whether the fees are in the quotation. Our team coordinates the submissions your project needs, and any approval-related package or fee is itemised in the quotation. In Dubai that has meant Dubai Municipality and Dubai Development Authority (DDA) submissions, as on our government authority headquarters in Dubai Academic City.

Who Actually Does the Work

5. Who makes the joinery?

Kitchens, wardrobes and wall panelling are the most visible part of most fit-outs, and the part most affected by UAE heat and humidity. Ask where they are made, who installs them and what materials are used. Joinery made in a factory, with CNC-cut components and controlled finishing, is usually more precise than joinery built on site. Ours is made in our own 15,000 sq ft factory in Ajman; our guide to bespoke joinery explains why that matters.

6. Who will be on site?

Ask who will manage the site day to day, and whether the tradespeople are the company's own team or hired per project. Subcontracting some specialist work is normal, but you should know about it in advance, and the company should stay responsible to you for the result.

7. Can I see finished work?

Ask for completed projects similar to yours in type and size, with the location, area and year. Photos alone are not enough. Our published projects list each one's location, size, year and the services it used, and you are welcome to visit our Ajman facility to see the finishes in person.

Time and Money

8. How is the programme set?

Be wary of a firm completion date before anyone has seen the site. A realistic programme comes after a site survey, once real measurements, access and building rules are known, and it should be written into the contract. As a guide, full turnkey villa projects typically take three to six months from first consultation to handover, including design sign-off and approvals; the on-site fit-out itself usually runs 6–10 weeks. Our process sets out each stage.

9. How are payments structured?

Our general advice: tie payments to clear milestones you can check, such as design approval, start on site, joinery delivery and handover, and avoid paying most of the contract value before any real work has begun.

10. What happens if the scope changes?

Changes happen on most projects. What matters is that any change is priced and approved in writing before it is carried out, with its effect on the programme stated, so there is no surprise invoice at the end.

After Handover

11. What guarantee, and on what?

"Years of guarantee" means little without detail. Ask what exactly is covered, for how long, and who carries out the repair. We give a 5-year workmanship guarantee on the joinery we manufacture and install, and we say so in writing.

12. Who do I call after handover?

Hinges, drawer runners, finishes and curtain tracks need care over time, especially in the UAE climate. Ask whether the company offers aftercare and maintenance and how you request it.

Red Flags to Watch For

  • A quotation without a site visit, or a price per square foot with no breakdown.
  • Verbal promises that do not appear in the contract or quotation.
  • A large upfront payment before any work you can check.
  • "Approvals are your problem", with no help or explanation.
  • No trade licence or comparable finished projects when you ask for them.

How to Compare Two Quotes Like for Like

CompareWhat to ask
ScopeDo both quotations cover the same rooms and works, line by line?
Finish levelWhich materials and finishes are named for each item?
JoineryWhere is it made, from what, and who installs it?
ApprovalsWho handles them, and are the fees included or excluded?
Exclusions5% VAT, authority fees and third-party charges.
ProgrammeIs it written down, and based on a real site survey?
GuaranteeWhat exactly does it cover, and for how long?

For worked examples with real figures, see our villa renovation cost guide and office fit-out cost guide.

Frequently Asked Questions

How many quotes should I get for a fit-out in Dubai?

Two or three is usually enough, as long as they are for the same scope and a similar finish level. Comparing quotations for different scopes leads to the wrong conclusion.

Is the cheapest fit-out quote the best value?

Not necessarily. A lower price often comes from lower-grade materials, excluded items or approvals left out. Compare what each quotation includes before you compare the totals.

Do I need approval to renovate my villa or apartment in Dubai?

It depends on the building, the area and the work. Many works need at least an NOC from the building management or developer, and layout changes and MEP works can need an authority approval. The fit-out company should tell you what applies to your project after the site survey.

How long does a fit-out take in Dubai?

Full turnkey villa projects typically take three to six months from first consultation to handover, and the on-site fit-out usually runs 6–10 weeks once the design is approved. Your own programme is confirmed in writing after the survey.

Ready to start your project?

Ask us these twelve questions. Contact Bait Al Ebdaa to arrange a free site survey, and you will receive an itemised quotation with no obligation.