Two drawings show oak doors, a stone worktop and a tall cabinet beside the fridge. In the first, the dishwasher opening is too small for the machine you own. In the second, the machine fits, but the quote leaves out who fits its matching door and connects the water. Which kitchen will cost less by the time you can cook in it again?
To compare offers for your Ajman home, give each contractor the same drawing and ask them to describe the kitchen they will leave ready for use. Take a family keeping its fridge, dishwasher and tiled floor as a working example. Here is how they can trace a quote from the first measurement to handover.
Give both contractors the same kitchen to price
Think back to the last meal you cooked. Where did you put the hot tray? Could someone open the fridge while you loaded the dishwasher? Pick two problems the new layout should solve. “Three deep drawers beside the hob for our pans” gives a designer something specific to draw and price.
Send each contractor the same wall photos, rough sketch and appliance model numbers. Mark what stays and what comes out. Our example family would like to move the sink under the window, but could live with it where it is. They can ask both contractors to price the existing sink position first, with a separate figure for moving it. That shows exactly what the extra work buys them.
A checklist for reading the quotes side by side
Give each contractor a column. Write “awaiting price” wherever an essential item is missing. Entering zero for an unpriced connection or removal makes the total look settled while you still have a bill to find.
| Item | What to record for each quote |
|---|---|
| Survey and drawing | Drawing revision, who checks dimensions and who signs off fabrication. |
| Removal and access | Appliances to keep, waste collection, lift arrangements and protection for shared areas. |
| Cabinets | Quantity, width, cabinet body, fronts, hinges and drawer runners. |
| Worktop | Material, thickness, edge, joints, sink and hob cut-outs, delivery and fitting. |
| Appliances | Model, supplier, installer and responsibility for final connections. |
| Finishes | Tile, floor, plaster and paint repairs where old units come out. |
| Price and schedule | Fixed sums, allowances, exclusions, tax basis and payment stages. |
| Handover | Operating checks, outstanding items, care instructions and follow-up contact. |
Match the price to a dated drawing
A floor plan shows where the units go. An elevation, the view facing each wall, shows what sits inside and above them. Check both. If the fridge sits beside a wall, can you open its door far enough to remove the vegetable drawer? Ask what a narrow filler strip does before asking the designer to take it out.
A switch from a freestanding cooker to a built-in oven and separate hob can change the cabinet, worktop cut-out and connection. Ask for the revised drawing and the finish sample codes to be attached to the quote you approve. If you are still deciding on the layout, see kitchen design in Ajman and agree which drawings you need before requesting installation prices.
Count the units behind the doors
Read one wall at a time. A sink cabinet, dishwasher opening, drawer stack and corner cupboard may run the length of the wall, but the dishwasher opening provides no cabinet storage. Compare upper and tall units separately. Check the finish on the exposed end panel you can see from the dining table.
Ask for samples of the cabinet body and door, then check the material, thickness and edge finish against the quote. Try a sample drawer with your largest pan in mind. If one contractor has drawn shelves behind doors where the other has priced full-extension drawers, ask for the difference on that unit. It may answer the price question without changing every door in the room.
Follow the worktop around the room
Trace the exposed edges on the plan. Where would a joint fall on the breakfast counter? Is the strip behind the hob a short upstand or a full-height splashback? For an island, provide its depth as well as its length and identify the edges visible from the stools.
List the sink, cut-out, edge finishing, sink fitting and tap connection separately. Do the same for the hob. Ask when the installer needs the actual appliances for measuring, who will receive them and who approves any price change before the stone is cut.
Find out who connects each appliance
Beside each model, write down who supplies it, fits it and makes the final connection. An integrated dishwasher can slide into the correct opening and still need a matching door, a handle and a separate appointment for the water connection. Check that the door will open past the plinth once fitted.
For the optional sink move, request one description covering the pipe route, cabinet changes, stone cut-out and repairs. If the route cannot be confirmed until the old units come out, record that uncertainty and how you will approve the extra cost. The family can then decide whether moving the sink matters more than the drawers they will use every evening.
Plan for the day the old kitchen comes out
Follow the route from the kitchen door to the loading point. For an apartment, ask your building manager about working hours, service lift bookings and corridor protection. For a villa, check vehicle access and the floors along the route. Send the arrangements for your address to both contractors and ask who organises them.
Photograph the condition of appliances you are keeping and agree where they will go. A shallower replacement cabinet can expose a strip of untiled floor. Fewer wall cupboards can leave old fixing holes on show. Ask who will make these areas good. For damage discovered behind the sink, agree to review a photo, a repair price and any delay before extra work starts.
A worked comparison before you pay a deposit
Suppose the first quote includes cabinets, delivery and an allowance for stone. The second names the stone and includes taking out the old units. Ask the first contractor to price the selected stone and removal. Ask the second whether removal includes taking waste out of the building and which drawer runners are included. You now have specific differences to weigh up.
Keep three figures for each offer. Record the fixed price, the allowances for choices still open and any work you will pay another supplier to do. Compare totals on the same tax basis. If you change the tap, send the same model to each contractor. Keep optional alternatives on their own lines.
Check when the drawings go to the workshop, when the old kitchen comes out, when the worktop gets measured and when water is expected back on. If an appliance is delayed, ask whether you can keep using the old sink a little longer. Match payment stages to work you can check.
Agree the handover checks
Open neighbouring doors together, pull each drawer all the way out and try the dishwasher door. Examine the worktop joints in daylight. Ask the installer to demonstrate the connected items and show you the water shut-off. Photograph any outstanding work and agree who will follow up and when. Keep the finish codes, appliance documents and stone care instructions together.
For a survey covering removal and installation, send your photos, appliance list and preferred layout through kitchen renovation in Ajman. Mention any open choice, such as relocating the sink, so it can be discussed and priced separately.
Further reading
See IKEA UAE’s kitchen measuring service, Fix Hero’s renovation scope and Itqan’s kitchen specification guide. Use them to identify questions for your contractor, then check the answers against your own written quote.
Frequently Asked Questions
Are photos enough for an initial kitchen quote?
Send the same photos and rough dimensions to each contractor and ask them to record their assumptions. Before fabrication, ask for a measured drawing and an updated quote that names the quantities, finishes and appliances.
How do I compare a price per linear metre?
Ask which walls and units the rate covers. Check corners, tall units, drawer stacks and appliance openings. Then request a total for the complete drawing with the worktop and installation shown.
How can I bring the price down without losing the features I need?
Price one change at a time. Try keeping the sink in place, simplifying one pull-out accessory or changing the door finish. Record the saving and what it changes in everyday use.
What should I send with my first enquiry?
Include your area in Ajman, property type, photos, a rough plan and appliance models. Mark what stays and any access restrictions. If you have two layouts, choose one for the base quote and request the second as an option.